Fission Completes Resource Upgrade & Growth Drilling; Strong Mineralization in All Holes
Canada NewsWire
ir@fissionuranium.com
www.fissionuranium.com
TSX SYMBOL: FCU
OTCQX SYMBOL:
FCUUF
FRANKFURT
SYMBOL: 2FU
100% hit rate for nineteen-hole program on the R1515W zone
KELOWNA, BC , July 17, 2024 /CNW/ – FISSION URANIUM CORP. (” Fission ” or ” the Company “) is pleased to announce results from the final thirteen drill holes on the R1515W zone at its PLS property, in Canada’s Athabasca Basin region. All holes intercepted wide intervals of mineralization, with nine holes additionally hitting high-grade sections. Of particular note, PLS24-664 (line 1545W) intersected 6.74m of total composite >10,000 cps in 77.0m of total composite mineralization and PLS24-663 (line 1500W) intersected 5.79m of total composite >10,000 cps in 50.4m of total composite mineralization . The R1515W upgrade program is now complete. Results will be used to upgrade the resource classification of the zone from mostly inferred to indicated and higher, for potential inclusion in the current mine plan (see News Release April 08, 2024 ).
Ross McElroy , President and CEO for Fission, commented, “Our resource growth program has been a resounding success. Every hole is strongly mineralized with the majority intersecting high-grade intervals. With these results in hand, and once assay results quantify and qualify results, we are confident we will have achieved our goal of upgrading the majority of the R1515W zone resource classification. After which, once upgraded, we will be able to consider including the zone in the mine plan in the future. This in turn will increase mine reserves and further enhance the production profile of the PLS project. ”
Drilling Highlights
- Final thirteen holes of the R1515W program have intercepted strong, wide mineralization
-
Hole PLS24-664 (line 1545W)
- 77.0m total composite mineralization over a 153.0m interval (between 131.0m to 284.0m ), including
- 6.74m of total composite >10,000 cps with maximum peaks to >65,535 cps over a total composite of 1.0m
-
Hole PLS24-663 (line 1500W)
- 50.4m total composite mineralization over a 78.5m interval (between 117.0m to 195.5m ), including
- 5.79m of total composite >10,000 cps with maximum peaks to >65,535 cps over a total composite of 1.64m
Table 1: Drill Hole Summary
Hole ID |
Zone |
Collar |
Hand-held Scintillometer Results On Mineralized
|
Basement
|
Total
|
|||||
Grid
|
Az |
Dip |
From
|
To
|
Width
|
CPS Peak Range |
||||
PLS24-660 |
R1515W |
1560W |
337 |
-66.9 |
126.0 |
126.5 |
0.5 |
300 |
117.5 |
365.4 |
|
|
|
|
|
134.5 |
140.0 |
5.5 |
<300 – 480 |
|
|
|
|
|
|
|
181.0 |
188.0 |
7.0 |
<300 – 660 |
|
|
|
|
|
|
|
199.5 |
203.5 |
4.0 |
300 – 27500 |
|
|
|
|
|
|
|
206.0 |
207.0 |
1.0 |
390 – 400 |
|
|
|
|
|
|
|
212.5 |
216.5 |
4.0 |
<300 – 1000 |
|
|
|
|
|
|
|
229.5 |
240.0 |
10.5 |
<300 – 15000 |
|
|
|
|
|
|
|
244.0 |
246.0 |
2.0 |
<300 – 320 |
|
|
|
|
|
|
|
258.0 |
261.5 |
3.5 |
470 – 1000 |
|
|
|
|
|
|
|
281.5 |
282.0 |
0.5 |
710 |
|
|
|
|
|
|
|
300.5 |
303.5 |
3.0 |
460 – 2900 |
|
|
PLS24-662 |
R1515W |
1515W |
336 |
-65.1 |
204.5 |
208.0 |
3.5 |
330 – 1100 |
124.2 |
359.0 |
|
|
|
|
|
250.0 |
252.5 |
2.5 |
340 – 15700 |
|
|
|
|
|
|
|
257.5 |
273.5 |
16.0 |
<300 – 9300 |
|
|
|
|
|
|
|
276.5 |
285.5 |
9.0 |
<300 – 44800 |
|
|
|
|
|
|
|
288.5 |
289.5 |
1.0 |
460 – 1200 |
|
|
|
|
|
|
|
296.0 |
298.5 |
2.5 |
<300 – 1000 |
|
|
|
|
|
|
|
309.0 |
309.5 |
0.5 |
760 |
|
|
PLS24-663 |
R1515W |
1500W |
336 |
-65.4 |
117.0 |
117.4 |
0.3 |
320 |
113.6 |
281.0 |
|
|
|
|
|
122.5 |
127.0 |
4.5 |
<300 – 430 |
|
|
|
|
|
|
|
130.0 |
134.0 |
4.0 |
<300 – 7100 |
|
|
|
|
|
|
|
154.0 |
195.5 |
41.5 |
<300 – >65535 |
|
|
PLS24-664 |
R1515W |
1545W |
336 |
-65.7 |
131.0 |
131.5 |
0.5 |
300 |
115.5 |
332.0 |
|
|
|
|
|
156.5 |
157.5 |
1.0 |
510 – 670 |
|
|
|
|
|
|
|
164.0 |
199.5 |
35.5 |
<300 – 52400 |
|
|
|
|
|
|
|
218.0 |
220.5 |
2.5 |
<300 – 540 |
|
|
|
|
|
|
|
230.0 |
236.5 |
6.5 |
<300 – 18900 |
|
|
|
|
|
|
|
242.0 |
243.0 |
1.0 |
300 – 320 |
|
|
|
|
|
|
|
248.5 |
261.0 |
12.5 |
<300 – >65535 |
|
|
|
|
|
|
|
263.5 |
272.5 |
9.0 |
<300 – >65535 |
|
|
|
|
|
|
|
275.5 |
284.0 |
8.5 |
<300 – 6100 |
|
|
PLS24-665 |
R1515W |
1530W |
336 |
-66.1 |
120.0 |
120.5 |
0.5 |
380 |
117.9 |
345.0 |
|
|
|
|
|
124.5 |
131.5 |
7.0 |
<300 – 800 |
|
|
|
|
|
|
|
134.5 |
135.5 |
1.0 |
380 |
|
|
|
|
|
|
|
179.0 |
194.0 |
15.0 |
<300 – 3600 |
|
|
|
|
|
|
|
198.5 |
201.5 |
3.0 |
<300 – 520 |
|
|
|
|
|
|
|
211.0 |
215.0 |
4.0 |
<300 – 1500 |
|
|
|
|
|
|
|
234.5 |
239.0 |
4.5 |
<300 – 25500 |
|
|
|
|
|
|
|
241.5 |
242.5 |
1.0 |
570 – 810 |
|
|
|
|
|
|
|
246.5 |
247.0 |
0.5 |
540 |
|
|
|
|
|
|
|
249.5 |
262.5 |
13.0 |
<300 – 21100 |
|
|
|
|
|
|
|
265.0 |
265.5 |
0.5 |
750 |
|
|
|
|
|
|
|
278.0 |
289.0 |
11.0 |
<300 – 1600 |
|
|
PLS24-666 |
R1515W |
1500W |
335 |
-65.3 |
115.1 |
116.7 |
1.7 |
470 – 2000 |
115.0 |
278.0 |
|
|
|
|
|
123.0 |
123.5 |
0.5 |
350 |
|
|
|
|
|
|
|
149.0 |
152.0 |
3.0 |
310 – 620 |
|
|
|
|
|
|
|
168.5 |
169.0 |
0.5 |
400 |
|
|
|
|
|
|
|
171.5 |
172.0 |
0.5 |
380 |
|
|
|
|
|
|
|
190.0 |
191.0 |
1.0 |
340 – 430 |
|
|
PLS24-668 |
R1515W |
1500W |
336 |
-64.9 |
136.5 |
138.5 |
2.0 |
<300 – 1400 |
115.3 |
278.0 |
|
|
|
|
|
147.5 |
151.0 |
3.5 |
<300 – 610 |
|
|
|
|
|
|
|
160.5 |
188.5 |
28.0 |
<300 – 18300 |
|
|
|
|
|
|
|
214.0 |
220.5 |
6.5 |
<300 – 1500 |
|
|
|
|
|
|
|
225.0 |
225.5 |
0.5 |
360 |
|
|
PLS24-669 |
R1515W |
1530W |
338 |
-65.3 |
152.0 |
152.5 |
0.5 |
390 |
118.9 |
377.0 |
|
|
|
|
|
163.0 |
163.5 |
0.5 |
300 |
|
|
|
|
|
|
|
214.5 |
216.0 |
1.5 |
1300 – 8400 |
|
|
|
|
|
|
|
231.0 |
233.5 |
2.5 |
<300 – 550 |
|
|
|
|
|
|
|
243.5 |
245.0 |
1.5 |
530 – 900 |
|
|
|
|
|
|
|
250.0 |
254.0 |
4.0 |
310 – 960 |
|
|
|
|
|
|
|
259.5 |
261.5 |
2.0 |
440 – 1300 |
|
|
|
|
|
|
|
269.5 |
290.5 |
21.0 |
<300 – 28500 |
|
|
|
|
|
|
|
296.0 |
296.5 |
0.5 |
2300 |
|
|
|
|
|
|
|
309.5 |
310.5 |
1.0 |
630 – 1100 |
|
|
PLS24-671 |
R1515W |
1560W |
336 |
-62.2 |
132.0 |
132.5 |
0.5 |
300 |
126.5 |
323.0 |
|
|
|
|
|
145.0 |
145.5 |
0.5 |
300 |
|
|
|
|
|
|
|
169.0 |
193.5 |
24.5 |
<300 – 5900 |
|
|
|
|
|
|
|
210.0 |
211.5 |
1.5 |
440 – 610 |
|
|
|
|
|
|
|
238.5 |
247.5 |
9.0 |
<300 – 5500 |
|
|
|
|
|
|
|
250.0 |
253.5 |
3.5 |
500 – 28200 |
|
|
PLS24-673 |
R1515W |
1560W |
336 |
-78.0 |
172.0 |
173.0 |
1.0 |
370 |
105.2 |
284.0 |
|
|
|
|
|
180.0 |
196.5 |
16.5 |
<300 – 48800 |
|
|
|
|
|
|
|
215.0 |
215.5 |
0.5 |
310 |
|
|
PLS24-675 |
R1515W |
1515W |
337 |
-64.7 |
119.0 |
121.0 |
2.0 |
300 – 400 |
117.1 |
304.3 |
|
|
|
|
|
126.0 |
126.5 |
0.5 |
560 |
|
|
|
|
|
|
|
156.0 |
162.5 |
6.5 |
300 – 2500 |
|
|
|
|
|
|
|
184.0 |
193.5 |
9.5 |
<300 – 1800 |
|
|
|
|
|
|
|
210.0 |
242.0 |
32.0 |
<300 – 6200 |
|
|
PLS24-676 |
R1515W |
1545W |
337 |
-75.0 |
177.5 |
178.5 |
1.0 |
350 – 500 |
106.1 |
293.0 |
|
|
|
|
|
184.0 |
184.5 |
0.5 |
340 |
|
|
|
|
|
|
|
190.0 |
194.0 |
4.0 |
<300 – 710 |
|
|
|
|
|
|
|
206.5 |
246.5 |
40.0 |
<300 – 7000 |
|
|
|
|
|
|
|
249.0 |
249.5 |
0.5 |
790 |
|
|
PLS24-677 |
R1515W |
1530W |
335 |
-81.0 |
178.0 |
178.5 |
0.5 |
500 |
104.5 |
290.0 |
|
|
|
|
|
188.5 |
194.5 |
6.0 |
<300 – 400 |
|
|
|
|
|
|
|
203.5 |
211.5 |
8.0 |
<300 – 5300 |
|
|
|
|
|
|
|
214.5 |
230.5 |
16.0 |
<300 – 7100 |
|
|
Drilling: Technical Details for the R1515W Zone and the 19-Hole Program
The R1515W zone presently contains an Indicated Resource of 67,000 tonnes at an average grade of 1.15% U 3 O 8 totaling 1.7 million lb. U 3 O 8 and an Inferred Resource of 234,000 tonnes at an average grade of 0.96% U 3 O 8 totaling 5 million lb. U 3 O 8 , using a cutoff grade of 0.25% U 3 O 8 . The objective of R1515W drilling was to convert areas of the R1515W zone currently classified as Inferred Resources to Indicated Resources through closely spaced drilling, potentially allowing it to be brought into the current mine plan. Drillhole pierce point spacing at the R1515W zone to upgrade the resource classification targeted ~25m by ~15m, grid north-south by grid east-west, respectively. Additionally, critical geotechnical and hydrogeological information will be collected at the R1515W zone, to be used in the assessment of viability of inclusion in the overall PLS project mine plan and schedule.
Line 1500W
Three additional drillholes, PLS24-663, 666 and 668 have been completed on gridline 1500W in 2024, aiming to confirm modeled uranium mineralization in the east-most area of the R1515W zone. PLS24-663 intersected bedrock at a depth of
113.6m
, consisting of a
1.5m
thin lens of Devonian sandstone underlain by strongly altered orthogneiss to a depth of
197.8m
and finally quartz-feldspar gneiss to a final depth of
281.0m
. A total of
50.4m
of total composite radioactivity >300 counts per second (cps) on handheld scintillometer were intersected in four zones, including a total of
5.79m
>10,000 cps. PLS24-666 was drilled up-dip of PLS24-663 and intersected bedrock at a depth of
115.0m
, consisting of strongly altered orthogneiss to
175.1m
and footwall quartz-feldspar gneiss to the end of the drillhole at
278.0m
. A total of
7.2m
of composite radioactivity >300 cps was interested in six zones. PLS24-668 was drilled down-dip of PLS24-663 and intersected bedrock at a depth of
115.3m
, consisting of silicified hanging wall to
143.0m
, strongly altered orthogneiss to
220.4m
and finally quartz-feldspar gneiss footwall to a final depth of
278.0m
. A total of
40.5m
of total composite radioactivity >300 cps was intersected in five zones, including
0.25m
of >10,000 cps radioactivity. The radioactivity cored in PLS24-663 represents the strongest radioactivity seen on grid line 1500W to date and is open to the east.
Line 1515W
Two additional drillholes, PLS24-662 and 675 have been completed on grid line 1515W in 2024, aiming to confirm modeled uranium
mineralization
in the eastern R1515W. PLS24-662 intersected bedrock at a depth of
124.2m
downhole which consisted of a silicified hanging wall underlain by strongly altered orthogneiss and
graphitic
mylonite and finally footwall quartz-feldspar gneiss, the latter of which continued to a final depth of
359.0m
. Thirty-five meters of total composite radioactivity >300
cps
on handheld scintillometer were intersected in seven zones between
204.5m
and
309.5m
, including
0.59m
of total composite radioactivity >10,000
cps
. PLS24-675 was drilled up-dip of PLS24-652 and intersected bedrock at a depth of
117.1m
, consisting of moderate to strongly altered sequence of orthogneisses and quartz-feldspar gneiss, followed by footwall quartz-feldspar gneiss to a final depth of
340.3m
. A total of
50.5m
of composite radioactivity >300
cps
was intersected in five zones between
119.0m
to
242.0m
. Radioactivity remains open grid-south of PLS24-662.
Line 1530W
Three additional drillholes, PLS24-665, 669 and 677 were completed on line 1530W in 2024, targeting modeled uranium mineralization in the central R1515W zone. PLS24-665 intersected bedrock at a depth of
117.9m
and consisted of strongly altered orthogneiss and mylonite followed by variably clay, chlorite and hematite altered footwall quartz-feldspar gneiss to the end of the drillhole at a depth of
345.0m
. A total of
61.0m
of total composite radioactivity >300 cps was intersected in five zones between
120.0m
and
289.0m
, including
1.5m
> 10,000 cps. PLS24-669 intersected bedrock at a depth of
118.9m
and consisted of strongly altered orthogneiss and mylonite followed by variably clay, chlorite and hematite altered footwall quartz-feldspar gneiss to the end of the drillhole at a depth of
377.0m
. A total of
35.0m
of total composite radioactivity >300 cps was intersected in five zones between
152.0m
and
310.5m
, including
0.82m
> 10,000 cps. PLS24-677 intersected bedrock at a depth of
104.5m
and consisted of strongly altered orthogneiss and quartz-feldspar gneiss followed by variably clay, chlorite and hematite altered footwall quartz-feldspar gneiss to the end of the drillhole at a depth of
290.0m
. A total of
30.5m
of total composite radioactivity >300 cps was intersected in four zones between
178.0m
and
230.5m
. The radioactivity intersected in PLS24-677 remains open to the grid-north.
Line 1545W
Two additional drillholes, PLS24-664 and 676 were completed on line 1545W in 2024, aiming to confirm line-central and footwall uranium
mineralization
modeling, respectively. PLS24-664 intersected bedrock at a depth of
115.5m
which consisted of the typical sequence of strongly altered orthogneiss intercalated with mylonite, followed by footwall quartz-feldspar gneiss to a final depth of
332.0m
. PLS24-664 intersected a total of
77.0m
of total composite radioactivity >300
cps
in nine zones between
131.0m
and
284.0m
, including
6.74m
>10,000
cps
and
1.0m
>65,535
cps
. PLS24-676 intersected bedrock at a depth of
106.1m
, which consisted of intensely altered orthogneiss intercalated with coarse grained quartz-feldspar gneiss followed by footwall quartz-feldspar gneiss to a final depth of
293.0m
. The drillhole intersected
46.0m
of total composite radioactivity >300
cps
in five zones between
177.5m
to
249.5m
.
Line 1560W
Three additional drillholes, PLS24-660, 671 and 673 were completed on line 1560W in 2024, aiming to confirm line-central and footwall uranium
mineralization
modeling at the western end of R1515W. PLS24-660 intersected bedrock at a depth of
117.5m
which consisted of strongly altered orthogneiss and mylonite to
288.2m
followed by variably altered footwall quartz-feldspar gneiss to a final depth of
365.4m
. Forty-four meters of total composite radioactivity >300
cps
was intersected between
126.0m
to
303.5m
in twelve zones, including
1.07m
of total composite radioactivity >10,000
cps
. PLS24-671 intersected bedrock at a depth of
126.5m
which consisted of a silicified hanging wall to
198.6m
, strongly altered orthogneiss and mylonite to
257.4m
followed by variably altered footwall quartz-feldspar gneiss to a final depth of
323.0m
. A total of
39.5m
of composite radioactivity >300
cps
was intersected between
132.0m
to
253.5m
in six zones, including
0.75m
of total composite radioactivity >10,000
cps
. PLS24-673 intersected bedrock at a depth of
105.2m
which consisted of strongly altered orthogneiss and mylonite to
192.5m
followed by variably altered footwall quartz-feldspar gneiss to a final depth of
284.0m
. Eighteen meters of total composite radioactivity >300
cps
was intersected between
172.0m
to
215.5m
in three zones, including
2.0m
of total composite radioactivity >10,000
cps
. The radioactivity intersected in PLS24-673 remains open to the grid-north.
Natural gamma radiation in drill core that is reported in this news release was measured in counts per second (cps) using a hand-held RS-125 Scintillometer manufactured by Radiation Solutions, which is capable of discriminating readings up to 65,535 cps. Drill holes are systematically down-hole surveyed for natural gamma radiation, measured in counts per second (cps) using a Mount Sopris 2GHF-1000 Triple Gamma probe, which allows for accurate measurements in high grade mineralized zones. The reader is cautioned that scintillometer readings are not directly or uniformly related to uranium grades of the rock sample measured, and should be used only as a preliminary indication of the presence of radioactive materials. The degree of radioactivity within the mineralized intervals is highly variable and associated with visible pitchblende mineralization. All intersections are down-hole. All depths reported of core interval measurements including radioactivity and mineralization intervals widths are not always representative of true thickness. The orientation of the mineralized intervals tend to follow that of lithologic contacts, and generally dip steeply to the south. Within the Triple R deposit, individual zone wireframe models constructed from assay data and used in the resource estimate indicate that all five zones have a complex geometry controlled by and parallel to steeply south-dipping lithological boundaries as well as a preferential sub-horizontal orientation.
Samples from the drill core will be split in half sections on site and where possible, samples will be standardized at 0.5m down-hole intervals. One-half of the split sample will be sent to SRC Geoanalytical Laboratories (an SCC ISO/IEC 17025: 2005 Accredited Facility) in Saskatoon, SK for analysis which includes U 3 O 8 (wt %) and fire assay for gold, while the other half remains on site for reference. All analysis includes a 63 element ICP-OES, uranium by fluorimetry and boron.
PLS Mineralized Trend & Triple R Deposit Summary
Uranium mineralization at the Triple R deposit at PLS occurs within the Patterson Lake Conductive Corridor and has been traced by core drilling over ~3.18km of east-west strike length in five separated mineralized “zones”, which collectively make up the Triple R deposit. From west to east, these zones are R1515W, R840W, R00E, R780E and R1620E. Through successful exploration programs completed to date, Triple R has evolved into a large, near-surface, basement-hosted, structurally controlled high-grade uranium deposit. The discovery hole was announced on November 05, 2012 , with drill hole PLS12-022 from what is now referred to as the R00E zone.
The R1515W, R840W and R00E zones make up the western region of the Triple R deposit and are located on land, where overburden thickness is generally between 55m to 100 m . R1515W is the westernmost of the zones and is drill defined to ~90m in strike length, ~68m across strike and ~220m vertical and where mineralization remains open in several directions. R840W is located ~515m to the east along the strike of R1515W and has a drill-defined strike length of ~430m. R00E is located ~485m to the east along strike of R840W and is drill defined to ~115m in strike length. The R780E and R1620E zones make up the eastern region of the Triple R deposit. Both zones are located beneath Patterson Lake , where water depth is generally less than six metres, and overburden thickness is generally about 50m . R780E is located ~225m to the east of R00E and has a drill-defined strike length of ~945m. R1620E is located ~210m along strike to the east of R780E and is drill defined to ~185m in strike length.
Mineralization along the Patterson Lake Corridor trend remains prospective along strike in both the western and eastern directions. Basement rocks within the mineralized trend are identified primarily as mafic rocks with varying degrees of alteration. Mineralization is both located within and associated with mafic rocks with varying degrees of silicification, metasomatic mineral assemblages and hydrothermal graphite. The graphitic sequences are associated with the PL-3B basement Electro-Magnetic (EM) conductor.
Patterson Lake South Property
The 31,039-hectare PLS project is 100% owned and operated by Fission Uranium Corp. PLS is accessible by road with primary access from all-weather Highway 955, which runs north to the former Cluff Lake mine.
Qualified Persons
The technical information in this news release has been prepared in accordance with the Canadian regulatory requirements set out in National Instrument 43-101 and reviewed on behalf of the company by Ross McElroy , P.Geo., President and CEO for Fission Uranium Corp., a qualified person.
About Fission Uranium Corp.
Fission Uranium Corp. is an award-winning Canadian uranium project developer and 100% owner of the Patterson Lake South uranium property – a proposed high-grade uranium mine and mill in Canada’s Athabasca Basin region. Fission’s common shares are listed on the TSX Exchange under the symbol “FCU” and trade on the OTCQX marketplace in the U.S. under the symbol “FCUUF” and on the Frankfurt Stock Exchange under the symbol 2FU.
ON BEHALF OF THE BOARD
“Ross McElroy”
Ross McElroy , President and CEO
Cautionary Statement:
Certain information contained in this press release constitutes “forward-looking information”, within the meaning of Canadian legislation. Generally, these forward-looking statements can be identified by the use of forward-looking terminology such as “plans”, “expects” or “does not expect”, “is expected”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates” or “does not anticipate”, or “believes”, or variations of such words and phrases or state that certain actions, events or results “may”, “could”, “would”, “might” or “will be taken”, “occur”, “be achieved” or “has the potential to”. Forward looking statements contained in this press release may include statements regarding the future operating or financial performance of the Company which involve known and unknown risks and uncertainties which may not prove to be accurate. Actual results and outcomes may differ materially from what is expressed or forecasted in these forward-looking statements. Such statements are qualified in their entirety by the inherent risks and uncertainties surrounding future expectations. Among those factors which could cause actual results to differ materially are the following: market conditions and other risk factors listed from time to time in our reports filed with Canadian securities regulators on SEDAR+ at www.sedarplus.ca . The forward-looking statements included in this press release are made as of the date of this press release and the Company disclaims any intention or obligation to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise, except as expressly required by applicable securities legislation.
SOURCE Fission Uranium Corp.
View original content to download multimedia: http://www.newswire.ca/en/releases/archive/July2024/17/c7492.html